Omron NY532-5400 User Manual page 131

Ny-series ipc machine controller industrial panel pc / industrial box pc
Hide thumbs Also See for NY532-5400:
Table of Contents

Advertisement

 Required Processing Time to Maintain Concurrency
When you set a refreshing task for tags (network variables) to maintain the concurrency of data link
data, the processing time required for that specified task increases. Due to this increase in task pro-
cessing time, the refreshing of tag data link data may not occur during the packet interval (RPI)
period set for each connection. Therefore, you need to adjust the packet interval (RPI) settings to
match the period of the task specified as the refreshing task. Refer to 13-3-3 Relationship between
Task Periods and Packet Intervals (RPIs) for details.
 Task Setup Procedure
(1) Set the global variables for which to specify a refreshing task, and set the refreshing
tasks and accessing tasks in the Settings for Exclusive Control of Variables in Tasks
in the Task Setup on the Sysmac Studio.
(2) Set the variable access time for each refreshing task.
For details, refer to the NY-series Industrial Panel PC / Industrial Box PC Software User's Manual
(Cat. No. W558).
NY-series Industrial Panel PC / Industrial Box PC Built-in EtherNet/IP Port User's Manual (W563)
7 Tag Data Link Functions
7
7-15

Advertisement

Table of Contents
loading

Table of Contents