Post And Boot Specifications; Post; Boot - HP AA-RS2WC-TE Installation Manual

Storageworks core switch 2/64
Table of Contents

Advertisement

POST and Boot Specifications

The Core Switch 2/64 performs POST by default each time the chassis is powered
on ("cold boot") or the Core Switch 2/64 is rebooted or reset. The Core Switch
2/64 can be rebooted using the switchreboot, reboot, or fastboot
commands. The fastboot command reboots the switches without running
POST. If the active CP card is rebooted, it fails over to the other CP card.

POST

The success/fail results of the diagnostic tests that run during POST can be
monitored through LED activity, the error log, or a command-line interface.
POST requires a minimum of three minutes to complete (time may vary
depending on devices connected to Core Switch 2/64).
POST includes the following steps:
1. Preliminary POST diagnostics are run.
2. Operating system is initialized.
3. Hardware is initialized.
4. Diagnostic tests are run on several functions, including circuitry, port

Boot

Boot completes in a minimum of three minutes if POST is run.
In addition to POST, boot includes the following steps after POST is complete:
1. Universal port configuration is performed.
2. Links are initialized.
3. Fabric is analyzed. If any ports are connected to other switches, the switch
4. The switch obtains a domain ID and assigns port addresses.
5. Unicast routing tables are constructed.
6. Normal port operation is enabled.
Core Switch 2/64 V4.1 Installation Guide
functionality, ability to send and receive frames, all aspects of memory,
parity, statistics counters, and serialization.
participates in a fabric configuration.
Technical Specifications
183

Advertisement

Table of Contents
loading

Table of Contents