POST and boot specifications
When the switch is turned on or rebooted, the switch performs POST. Total boot time with POST
is a minimum of 3 minutes.
Use fastboot.to bypass POST after subsequent reboots by For more information about this
command, refer to the
running on your switch.
POST
The success/failure results of the diagnostic tests that run during POST can be monitored
through the error log or the CLI.
POST includes the following:
•
Preliminary POST diagnostics display.
•
Operating system is initializes.
•
Hardware initializes.
•
Diagnostic tests check several functions, including circuitry, port functionality, memory,
statistics counters, and serialization.
Boot
Boot completes in approximately 3 minutes with POST running. In addition to POST, boot
includes the following after POST completes:
•
Universal port configuration set
•
Links initialize
•
Fabric is analyzed, and if any ports are connected to other switches, the switch participates
in a fabric configuration.
•
Switch obtains a domain ID and assigns port addresses
•
Unicast routing tables constructed
•
Normal port operation enabled
76
Managing SAN switches
HP StorageWorks command reference guide
for the Fabric OS version