Connecting Power Cords - HP AA-RS2WC-TE Installation Manual

Storageworks core switch 2/64
Table of Contents

Advertisement

Installing and Configuring the Core Switch 2/64
4. Tighten both screws.
5. Repeat

Connecting Power Cords

Use these steps to connect power to the Core Switch 2/64.
1. Connect the power cords to the power connectors on the Core Switch 2/64,
Figure 19: Power cord connections
2. Connect the two AC power cords to a power source with voltage of 200 to
Note:
redundancy.
68
step 1
through
inserting them through the power cord retainers. The power cords are
designed with right and left bends to facilitate cord management.
240 VAC, 50-60 Hz.
Installing each power cord using two separate sources ensures power supply
step 4
for the second power cord retainer.
Core Switch 2/64 V4.1 Installation Guide
SHR-2531A

Advertisement

Table of Contents
loading

Table of Contents