Installing The V Series Clamping Fixture And Transducers; Installing The Fixture - GE TransPort PT878GC User Manual

Portable gas flowmeter
Table of Contents

Advertisement

April 2009
Installing the V Series Clamping Fixture and
Transducers
Note: A complete installation involves the clamping fixture,
transducers and dampening material. To apply
dampening material, refer to Installing Dampening
Material on page 3-25.
To install the V Series clamping fixture and transducers, complete
the following steps:

Installing the Fixture

1. Position the half of the clamping fixture with the threaded
rods around the pipe, as shown in Figure 3-7 below. Orient the
fixture in the 3 o'clock position on a horizontal pipe.
2. Position the mating half of the fixture over the threaded rods
in the 9 o'clock position. Figure 3-7 below shows the two
mounted halves.
Note: If you are using a V4 fixture with a 1.5 to 2-in. pipe, GE
Sensing suggests removing the set screws and the
mounting bracket, rotating them and the transducer yoke
180°, and replacing the bracket, yoke and screws for a
more secure fit.
Figure 3-7: Mounting the Two Halves of the Fixture
3-14
Installing the Dampening Material, Transducers and Fixtures

Advertisement

Table of Contents
loading

Table of Contents