GE TransPort PT878GC User Manual page 74

Portable gas flowmeter
Table of Contents

Advertisement

April 2009
Entering Pipe Parameters (cont.)
If you select a material that has the Schedule option:
a. The prompt asks if you wish to apply DIN (the DIN
schedule). Press
box. (If you do not select the DIN option, the prompt
moves to the OD text box, and you enter the parameters for
the Diameter alternative as discussed on the previous
page.)
Note: If you have selected English units in the Meter Menu (as
discussed on page 7-3), the schedules appear as ANSI.
b. Press the [ ] key twice to move the prompt to the
Nominal pipe size drop-down menu. Press
the menu. Scroll to the desired pipe size, and press
to confirm your choice.
c. Press the [ ] key to move the prompt to the Schedule
drop-down menu. Press
the desired schedule (5S, 10S, 40S or 80S), and press
[ENTER]
to confirm the choice.
After entering either diameter or schedule settings, pressing the
[
] key returns the meter to the Pipe Material prompt.
To confirm the entries and return to Operate mode, press
(OK).
To leave the window without confirming the entries and return
to Operate mode, press
To return to the Pipe tab and scroll to other windows, press the
[
] key.
4-10
[ENTER]
to select (or deselect) the DIN
[ENTER]
to open the menu. Scroll to
[F2]
(Cancel) or the
[ENTER]
to open
[ENTER]
[F3]
[ESC]
key.
Programming Site Data

Advertisement

Table of Contents
loading

Table of Contents