GE TransPort PT878GC User Manual page 58

Portable gas flowmeter
Table of Contents

Advertisement

April 2009
Installing DMP-1 Dampening Material with CFG-V
Series Fixtures (cont.)
11. Lay the second strip of dampening material flat. Then cut the
strip into two pieces, each 4.5-in. (12 cm) wide.
12. Wrap each of these strips around the pipe on the outside edge
of the clamping fixture, one upstream and one downstream.
The completed dampening material installation should appear
similar to Figure 3-26 below.
Figure 3-26: Completed DMP-1 Installation
3-28
Installing the Dampening Material, Transducers and Fixtures

Advertisement

Table of Contents
loading

Table of Contents