GE TransPort PT878GC User Manual page 47

Portable gas flowmeter
Table of Contents

Advertisement

Installing the Transducers (cont.)
3. Slide the second mounting block to the calculated spacing
plus the initial scale number selected for the first mounting
block. For example:
a. Initial convenient number for the first mounting block =
5 cm or 2 in.
b. Spacing as calculated by the PT878GC = 0.5 in. or 12.5
mm
c. Second mounting block final location = 1 + 0.5 in. = 1.5 in.
or 1 cm + 1.25 cm = 2.25 cm
The overall spacing between yokes should be left edge to left
edge, or right edge to right edge. Figure 3-12 below shows typical
positioning.
Figure 3-12: Top View of V4 Fixture
4. In a similar manner, install the second transducer as shown in
Figure 3-12 above.
Installing the Dampening Material, Transducers and Fixtures
S
S
with Both Transducers
April 2009
3-17

Advertisement

Table of Contents
loading

Table of Contents