Chapter 2 - Installation; Installing The Odu - Alvarion BreezeMAX 3500 System Manual

Hide thumbs Also See for BreezeMAX 3500:
Table of Contents

Advertisement

Chapter 2 - Installation

Installing the ODU

The following sections describe how to install the outdoor units of the
CPE (SU-ODU) and of the Base Station equipment (the AU-ODU is the
outdoor unit of each AU-IDU in the modular Base Station and of the
Micro Base Station), including pole mounting the ODU, and connecting
the cables.
ODU Installation Requirements
AU-ODU Packing List
ODU:
BMAX-BST-AU-ODU-3.5a, AU-ODU operating in the 3.5a band
OR
BMAX-BST-AU-ODU-3.5b, AU-ODU operating in the 3.5b band
Pole mounting kit
SU-ODU Packing List
ODU:
BMAX-CPE-ODU-AV-3.5, a CPE ODU with an integral vertically
polarized antenna
OR
BMAX-CPE-ODU-AH-3.5, a CPE ODU with an integral
horizontally polarized antenna
OR
BMAX-CPE-ODU-E-3.5, a CPE ODU with a connector to an
external antenna (not included)
Pole mounting kit
Additional Installation Requirements
The following items are also required to install the ODU:
2-2
BreezeMAX System Manual

Advertisement

Table of Contents
loading

Table of Contents