Reading the commissioning archive from the CompactFlash card
To import a start-up backup, perform the following operator actions:
1. Insert the CF card.
2. Press the <Customer CF card> softkey and select the line with the desired archive file.
3. Press <Copy> to copy the file to the clipboard.
4. Press the <802D data> softkey and position the cursor on the commissioning archive
5. Press the <Paste> softkey; the commissioning starts.
6. Acknowledge the start dialog on the control system.
9.3
Reading in / reading out PLC projects
When reading in a project, this will be transferred to the file system of the PLC and then acti-
vated. To complete the activation, the control system is restarted (warm start).
Reading the project from the CompactFlash card
To read in a PLC project, perform the following operator actions:
1. Insert the CF card.
2. Press the <Customer CF card> softkey and select the line with the desired project file in
3. Press <Copy> to copy the file to the clipboard.
4. Press the <802D data> softkey and position the cursor on the PLC Project (PT802D
5. Press <Paste> softkey; the reading in and activation starts.
Write the project to a CompactFlash card
Perform the following operator actions:
1. Insert the CF card.
2. Press the <802D data> softkey and use the arrow keys to select the PLC Project
3. Press <Copy> to copy the file to the clipboard.
4. Press the <Customer CF card> and select the saving location for the file
5. Press the <Paste> softkey; the writing process starts.
Grinding
Programming and Operating manual, 06/2006, 6FC5398-4CP10-0BA0
(NC/PLC) line.
PTE format.
*.PTE) line.
(PT802D *.PTE) line.
9.3 Reading in / reading out PLC projects
Data Backup
9-5