3.
Install Carriage Cable (spring/hook end)
NOTE: Cable orientation for all pulleys used at the spring/hook end are fed across the
pulleys from bottom-to-top.
2
Route the cable to the
top (small) pulley
1
Route the cable, first to the
bottom pulley, then to the
small pulley on the Half Rate
Carriage
Figure 9 Installing Carriage Cable (spring/hook end)
Repairs and Adjustments
REP 6.11
(Figure
9).
3
Attach the spring
to the cable hook
4.
If still present, remove any previously installed tape.
5.
Install Full Rate Carriage in IIT Frame.
6.
Adjust positions of Full Rate/Half Rate Carriages
7.
Manually move Full Rate Carriage to make sure it moves smoothly.
8.
Install remaining parts.
09/03
4-50
(ADJ
6.1).
Initial issue
DC 3535/2240/1632, WC M24