3.
Make sure when installing the Plate, that the Cable Tie (Strain Relief) is inside the Bracket
and the cable is routed through the notch
Bracket
Cable Tie
(Strain Relief)
Figure 9 Routing the Cable
Repairs and Adjustments
REP 12.6
(Figure
9).
Notch
09/03
4-112
Initial issue
DC 3535/2240/1632, WC M24