Blower Motor - Suzuki sq-416-420-625 Service Manual

Table of Contents

Advertisement

1. Fastening nuts
1. Air flow

BLOWER MOTOR

REMOVAL
1) Disconnect negative (–) cable at battery.
2) Disable air bag system, if equipped. Refer to DISABLING AIR
BAG SYSTEM in Section 10B.
3) Remove ECM with bracket from blower motor unit.
4) Disconnect harness clamps from dash panel.
5) Loosen three nuts fastening blower unit.
6) Disconnect blower motor lead wire at coupler (2).
7) Remove blower motor (3) from blower unit (1).
INSPECTION
D Check continuity between terminal to terminal as shown in left fig-
ure.
If check results are continuity, proceed to next operation check.
If not, replace.
D Connect battery to blower motor as shown, then check that the
blower motor operates smoothly and specified current.
Specified current: Max. 25 A at 12 V
INSTALLATION
1) Reverse removal procedure for installation.
2) Enable air bag system, if equipped. Refer to ENABLING AIR
BAG SYSTEM in Section 10B.
HEATER AND VENTILATION 1A-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents