Suzuki sq-416-420-625 Service Manual page 162

Table of Contents

Advertisement

3B1-18 POWER STEERING (P / S) SYSTEM
1. Tie-rod lock washer
(A)
1
"A"
1
1. Mark
INSTALLATION
1) Install new tie-rod lock washer and tie-rod to rack.
2) Tighten tie-rod ball nut to specified torque.
Tightening Torque
.
(a): 85 N
m (8.5 kg-m, 61.5 lb-ft)
3) Bend lock washer 2 place at the flat part of tie-rod ball nut.
4) Apply grease to "A" indicated in figure.
5) Position boot properly in grooves of gear case and tie-rod.
Check to ensure that boot is free from twist and dent.
6) Fasten boot with new clamp and clip securely.
Special Tool
(A): 09943-55010
7) Install tie-rod end lock nut and tie-rod end to tie-rod.
Position lock nut to marking made in removal.
NOTE:
When tie-rod was replaced, measure length "A" on re-
moved tie-rod and use it on new replacement tie-rod so as
to position lock nut properly.
8) Install steering gear case. Refer to "POWER STEERING GEAR
BOX ASSEMBLY INSTALLATION" in this section.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents