Procedure After Ecm/Pcm Replacement; Special Tools - Suzuki sq-416-420-625 Service Manual

Table of Contents

Advertisement

8G-30 IMMOBILIZER CONTROL SYSTEM (IF EQUIPPED)
09931-76011
Suzuki scan tool (Tech 1A kit)
09931-76030
16 / 14 pin DLC cable
PROCEDURE AFTER ECM/PCM
REPLACEMENT
When ECM/PCM was replaced, including when replaced because
rechecking by using a known-good ECM/PCM was necessary dur-
ing trouble diagnosis, register ECM/Immobilizer Control Module
code in ECM/PCM by performing following procedure.
1) Perform Steps 1) and 2) described in "How to register ignition
key" section. And then turn ignition switch ON.
2) Using TECH1, register ECM/Immobilizer Control Module code in
ECM/PCM by executing "RECORD ECU (RECORD ECM/PCM/
ICM)" command in SELECT MODE menu.
NOTE:
For operation procedure of Suzuki scan tool, refer to TECH1
operator's manual.
3) [Vehicle equipped with monitor coupler]
Make sure that malfunction indicator lamp lights when ignition
switch is turned OFF once and then ON.
[Vehicle not equipped with monitor coupler]
Make sure that immobilizer indicator lamp lights when ignition
switch is turned OFF once and then ON.

SPECIAL TOOLS

1. Storage case
2. Operator's manual
3. Tech 1A
4. DLC cable
(14 / 26 pin, 09931-76040)
5. Test lead/probe
6. Power source cable
7. DLC cable adapter
8. Self-test adapter
NOTE:
Use this cable only with im-
mobilizer cartridge of ver-
sion 1.1 or more.
Use of this cable with 96
immobilizer cartridge will
disable 96 immobilizer car-
tridge from operating prop-
erly.
Immobilizer cartridge of
version 1.1 or more
Mass storage cartridge of
version1.5 or more

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents