Service Engineer Installation Procedure; Pre-Installation Checks - AGFA Avantra 36/44 Service Manual

Table of Contents

Advertisement

Avantra 36/44 Service Manual
Cables–the system must be located so that the Agfa Print Engine Inter-
face Standard (APIS) cable between the Avantra and the RIP is of suffi-
cient length. Verify that all network and interface cables are of correct
length for other equipment to be installed (e.g., scanners and front-
ends).
Densitometer–a required tool for producing high quality film separa-
tions. Overall exposure and dot gain of the imagesetterneeds to be
checked to insure optimum and repeatable results. If a customer does
not currently own a densitometer, one may be purchased from a
graphic arts dealer. A transmission densitometer is needed to measure
film, and a reflective model for paper.
Light Table–a table surface of at least 54x72 inches is strongly recom-
mended for viewing separation films produced on the Avantra.
1.3

Service Engineer Installation Procedure

The following four procedural steps must be performed sequentially by the Agfa
service engineer:
1. Agfa pre-installation checks
2. System unpacking
3. System unlocking
4. System installation
5. Customer application training

1.3.1 Pre-installation Checks

This section contains a pre-installation checklist. Prior to unpacking, inspecting, or
installing the equipment the service engineer must verify that :
An isolated 115/220 VAC grounded line service to the Avantra has been
installed.
The AC service line to the Avantra contains a 15 amp fuse or circuit
breaker.
The AC service line has a NEMA 5-15R wall receptacle or equivalent.
The proper system operating environment exists.
There is adequate work space around the Avantra for service and mainte-
nance access.
If a modem is to be installed, there should be a dedicated telephone line
for the system.
1-4 Installation