Installation Procedure; Installation Requirements - Ricoh B003 Service Manual

Hide thumbs Also See for B003:
Table of Contents

Advertisement

1. INSTALLATION PROCEDURE

!
CAUTION
Never turn off the main power switch when the power LED is lit or flashing.
To avoid damaging the hard disk or memory, press the operation power
switch to switch the power off, wait for the power LED to go off, and then
switch the main power switch off.
NOTE: The main power LED (
ARDF is open, while the main machine is communicating with a facsimile
or the network server, or while the machine is accessing the hard disk or
memory for reading or writing data.

1.1 INSTALLATION REQUIREMENTS

!
CAUTION
LCT
"Rating Voltage of Output
Connector, Max. DC24 V"
SM
CÓPIA NÃO CONTROLADA
) lights or flashes while the platen cover or
B004I016.WMF
1-1
CÓPIA NÃO CONTROLADA
INSTALLATION REQUIREMENTS
ARDF
"Rating Voltage of Output
Connector, Max. DC24 V"
Scanner Unit
"Rating Voltage of Output
Connector, Max. DC24 V"
Finisher
"Rating Voltage of Output
Connector, Max. DC24 V"
B003/B004/B006/B007

Advertisement

Table of Contents
loading

This manual is also suitable for:

B004B006B007

Table of Contents