FIGURE 15-10
The system proceeds with its power-on sequence until the operating system shell
displays or the CDE environment is started, as specified in the init_default files.
3. If you installed a hard drive, PCI card, or CD-RW drive, become superuser and
reboot the system with the -r option. For example:
# reboot -- -r
This forces the system to recognize newly installed hardware.
15.5
Verifying an Installation
You can verify the functionality of the component you replaced or installed using the
following procedure.
1. Power on the system.
Refer to
2. Follow the power-on flowchart.
Refer to
Powering Up the Workstation
"Powering On the Workstation" on page
"Power-On Flowchart" on page
Power button
15-8.
4-2.
Chapter 15 Finishing Component Replacement
15-11