Installation And Configuration - Nortel Circuit Card Installation Manual

Nortel networks circuit card description and installation
Table of Contents

Advertisement

Page 204 of 906
Environmental specifications
Table 79
Lineside T1 card – environmental specifications
Parameter
Operating temperature-normal
Operating temperature-short term
Operating humidity-normal
Operating humidity-short term
Storage temperature
Storage humidity

Installation and configuration

553-3001-211
Standard 3.00
NT5D11 and NT5D14 Lineside T1 Interface cards
Table 79 lists the environmental specifications of the lineside T1 card.
Installation and configuration of the lineside T1 card consists of six basic
steps:
1
Configure the dip switches on the lineside T1 card for the environment.
2
Install the lineside T1 card into the selected card slots in the IPE shelf.
3
Cable from the I/O panel to the Customer Premise Equipment (CPE) or
CSU, MMI terminal or modem (optional), external alarm (optional), and
other lineside T1 cards for daisy chaining use of MMI terminal
(optional).
4
Configure the MMI terminal.
5
Configure the lineside T1 card through the system software and verify
self-test results.
6
Verify initial T1 operation and configure MMI (optional).
Steps 1-5 are explained in this section. Step 6 is covered in "Man-Machine T1
maintenance interface software" on
August 2005
Specifications
15° to +30° C (+59° to 86°F), ambient
10° to +45° C (+50° to 113°F), ambient
20% to 55% RH (non-condensing)
20% to 80% RH (non-condensing)
–50° to +70° C (–58° to 158°F), ambient
5% to 95% RH (non-condensing)
page
225.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents