Handlebars Inspection - Suzuki GSX-R600 Manual

Hide thumbs Also See for GSX-R600:
Table of Contents

Advertisement

• Insert the projection "C" of the right handlebar switch
box into the hole of the handlebars.
"C"
• Install the clutch lever holder. Refer to "Clutch Control
System Components in Section 5C (Page 5C-3)".
• Apply a handle grip bond "D" onto the left handlebar
before installing the handlebar grip.
: Handle grip bond (Handle Grip Bond
(commercially available))
"D"
• Insert the projection "E" of the left handlebar switch
box into the hole of the handlebars.
I837H1620008-01
I837H1620009-01
"E"
I837H1620010-01
• After installing the steering, the following adjustments
are required before driving.
– Throttle cable routing (Refer to "Throttle Cable
Routing Diagram in Section 1D (Page 1D-2)")
– Clutch cable routing (Refer to "Throttle Cable
Routing Diagram in Section 1D (Page 1D-2)")
– Throttle cable play (Refer to "Throttle Cable Play
Inspection and Adjustment in Section 1D (Page 1D-
7)")
– Clutch cable play (Refer to "Clutch Cable Play
Inspection and Adjustment in Section 0B (Page 0B-
14)")

Handlebars Inspection

Refer to "Handlebar Removal and Installation (Page 6B-
2)".
Inspect the handlebars for distortion and damage.
If any defect is found, replace the handlebars with a new
one.
Steering / Handlebar:
B837H16206004
I837H1620011-01
6B-4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents