REAR WHEEL/SUSPENSION
Install the pivot collars and side callars to the shock
arm (swing arm side,
shock
link side),
Apply
oil to the shock arm
nut
threads and
flange
surface.
Temporarily install the following:
- Shock link
- Shock link bottinul
-Shock
arm
-
Shock arm bolt/nut
(swingarm
side)
-
Shock arm boltlnut (shock link side)
Install
the
lower mounting bolt by aligning the cut
out of the bolt with the stopper on
the
shock ab·
sorber.
Tighten all nuts to the specified torque.
TORQUE:
Shock link
nut:
78
~
(8.0
kgf-m.
58
IbMt)
Shock
arm
nut
(swingarm side):
78
N-m
(8.0
kgfem
,
58
IbMt)
Shock
arm
nut
(shock
link
side):
18 N-m (8.0
kgt-m,
58 IbMt)
Shock
absorber lower
mounting
nut:
44
N-m
/4.5
kgt-m,
33 IbMt)
2()()()-
2001:
Install the drive chain
roller
and tighten the bolt
Install tile drive
to the
specified torque.
chain
roller
with
its
•• marie side
facing
out.
12-30
TORQUE:
2000:
After
2000:
22
N-m (2.2
kgpm.
16 IbMt)
12 N-m (1 .2
kgpm.
9 IbMt)
SIDE COLLARS
PIVOT
COLLARS
J;)
.)
SH()CK LINK
BOLT/NUT