Suzuki 2005 GSF1200 Service Manual page 79

Table of Contents

Advertisement

• Position the carburetor clamps as shown.
• After remounting the engine, route the wire harness, cables and hoses properly. Refer to "Wiring Harness Routing
Diagram: in Section 9A" and "Throttle Cable / Starter Cable Routing Diagram: in Section 1G".
• Install the gearshift lever to the gearshift shaft in the correct position.
Gearshift lever height "J"
55 mm (2.2 in)
• Tighten the oil drain plug to the specified torque.
Tightening torque
Oil drain plug (i): 23 N·m (2.3 kgf-m, 16.5 lb-ft)
"J"
(i)
Engine Mechanical:
I649G1170033-01
I649G1140029-02
I649G1140030-03
1D-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2005 gsf1200s1200 banditGsf1200Gsf1200s

Table of Contents