Buell 2009 XB Series Service Manual page 532

Table of Contents

Advertisement

HOME
INSTALLATION
1.
See
Figure 6-89
(Firebolt),
Figure 6-91
(Ulysses). Place instrument module (2) into
position in support (1).
2.
Install washers (4) and fasteners (5). Tighten fasteners to
12-36 in-lbs (1.4-4 Nm).
3.
See
Figure 6-86
(Firebolt),
Figure 6-88
(Ulysses). Connect instrument module con-
nector [39].
4.
For Firebolt, install headlight support bracket and install
front fairing. See
2.26 HEADLAMP ASSEMBLY AND
SUPPORT
BRACKET.
5.
For Lightning, install windscreen and for Ulysses, install
windscreen/windshield. See
AND SUPPORT
BRACKET.
6.
Install negative battery cable.
After installing seat, pull upward on seat to be sure it is
locked in position. While riding, a loose seat can shift
causing loss of control, which could result in death or
serious injury. (00070b)
7.
Install seat.
sm00414
Figure 6-86. Instrument Module Connector [39]: Firebolt
6-72 2009 XB Service: Electrical
Figure 6-90
(Lightning) or
Figure 6-87
(Lightning), or
2.26 HEADLAMP ASSEMBLY
sm00466a
Figure 6-87. Instrument Module Connector [39]: Lightning
sm00465a
Figure 6-88. Instrument Module Connector [39]: Ulysses

Advertisement

Table of Contents
loading

Table of Contents