Buell 2009 XB Series Service Manual page 329

Table of Contents

Advertisement

HOME
3.
With the lower part of the curve on the reed valve stop (2)
facing out, apply LOCTITE 222 (purple), install and tighten
fastener to 5-7 in-lbs (0.6-0.8 Nm).
sm02944
1
1.
Reed valve fastener
2.
Reed valve stop
sm00210
1
2
1.
Reed valve stop
2
Figure 3-104. Reed Valve Assembly
3
2.
Reed valve
Figure 3-105. Reed Valve Stop and Reed Valve
4.
If it was necessary to replace the reed block, apply LOC-
TITE 222 (purple), install the fasteners and tighten to 25-35
in-lbs (2.8-4.0 Nm).
3
3.
Reed valve
4.
Reed block
1
2
3.
3
Stop screw
2009 XB Service: Engine 3-75

Advertisement

Table of Contents
loading

Table of Contents