Install The Server In A Rack - Silicon Graphics Altix XE250 User Manual

Table of Contents

Advertisement

Install the Server in a Rack

!
007-5467-001
Warning:
The SGI Altix XE250 server weighs 57 lbs (26 kg) Always use proper lifting
techniques when your move the server. Always get the assistance of another qualified person
when you install the sever in a location above your shoulders. Failure to do so may result in
serious personal injury or damage to the equipment.
You should now have rails attached to both the server chassis and the rack unit. The next step is
to install the server into the rack (refer to
1.
Line up the rear of the chassis rails with the front of the rack rails.
2. Slide the server chassis rails into the rack rails, keeping the pressure even on both sides (you
may have to depress the locking tabs when inserting).
3. When the server has been pushed completely into the rack, you should hear the locking tabs
"click."
4. Install and tighten two screws to secure the server to the rack.
Figure
2-3).
Install the System into a Rack
2-21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Altix XE250 and is the answer not in the manual?

Table of Contents