Install The Server In A Rack - Silicon Graphics Rackable C2110G-RP5 System User's Manual

Table of Contents

Advertisement

2: Server Installation

Install the Server in a Rack

!
16
The tabs can lock the server into place when installed and pushed fully into the rack, (its
normal operating position).
The tabs also lock the server in place when fully extended from the rack. This prevents the
server from coming completely out of the rack when pulled out for servicing.
Depress both tabs at the same time to fully remove the server from its rail mounting and extract it
from the rack.
Warning:
The SGI Rackable C2110G-RP5 server weighs up to 57 lbs (25.9 kg) Always
use proper lifting techniques when your move the server. Always get the assistance of
another qualified person when you install the sever in a location above your shoulders.
Failure to do so may result in serious personal injury or damage to the equipment.
1.
Extend the outer rails as shown in
2. Align the inner rails of the chassis with the outer rails on the rack.
3. Slide the inner rails into the outer rails, keeping the pressure even on both sides. When the
chassis has been pushed completely into the rack, it should click into the locked position.
4. Optional screws are recommended to secure and hold the front of the chassis to the rack.
Figure 2-5 on page
17.
007-5841-001

Advertisement

Table of Contents
loading

Table of Contents