Using The Rail Locking Tabs; Install The Server In A Rack - Silicon Graphics InfiniteStorage C1104-GP6 System User's Manual

Table of Contents

Advertisement

Using the Rail Locking Tabs

Install the Server in a Rack

!
007-6465-001
Both chassis rails have a locking tab, which serves two functions:
The tabs can lock the server into place when installed and pushed fully into the rack, (its
normal operating position).
The tabs also lock the server in place when fully extended from the rack. This prevents the
server from coming completely out of the rack when pulled out for servicing. Depress both
tabs at the same time to fully remove the server from its rail mounting and extract it from the
rack.
Warning:
The SGI ISS C1104-GP6 server weighs up to 32 lbs (14.5 kg) Always use proper
lifting techniques when your move the server. Always get the assistance of another qualified
person and/or a mechanical lifting device when you install the sever. Failure to do so may
result in serious personal injury or damage to the equipment.
1.
Extend the outer rails on either side of the rack rail assembly.
2. Align the inner rails of the chassis with the outer rails on the rack, see Figure 2-6.
Install the System into a Rack
19

Advertisement

Table of Contents
loading

Table of Contents