Front Panel Cable; Replacing The Left Front Panel Cable - Fujitsu PRIMERGY CX400 M6 Upgrade And Maintenance Manual

Table of Contents

Advertisement

11.3

Front panel cable

11.3.1

Replacing the left front panel cable

Field Replaceable Unit
(FRU)
Tools:
Preliminary and concluding steps: Phillips PH2 / (+) No. 2
Main steps: tool-less
Preliminary steps
"Shutting down the server" on page
"Disconnecting the power cord" on page
▶ If the server node is installed in server node bay 2, remove it, see
"Removing server nodes from the server enclosure" on page
▶ If applicable, remove the front bezel, see
page
48.
▶ If applicable, remove the HDD/SSD modules until slot 6 from the left from
the relevant HDD/SSD cage, see
on page
116.
▶ If applicable, remove the 2.5-inch HDD/SSD dummy modules until slot 6
from the left from the relevant HDD/SSD cage, see
HDD/SSD dummy module" on page
"Extending the server enclosure out of the rack" on page
▶ If applicable, remove the front bezel mounted on the left end, see
"Removing the HDD/SSD x6 front bezel" on page
▶ If applicable, remove the front bezel mounted on the left end, see
"Removing the HDD/SSD x4 front bezel" on page
"Removing the top covers" on page
▶ Remove the high speed riser module on the left side, see
defective high speed riser module" on page
CX400 M6
41.
"Removing a 2.5-inch HDD/SSD module"
113.
54.
Upgrade and Maintenance Manual
Hardware: 30 minutes
42.
"Removing the front bezel" on
"Removing a 2.5-inch
49.
140.
141.
"Removing the
151.
Front panel
43.
177