Installation
Electrical shock due to contact with live parts
The DC link within the Power Module (PM) carries high voltages which has the potential to
cause severe personal injury.
• Before performing any installation work on the system, disconnect all power supplies to the
• After the power supplies have been disconnected, wait for at least five minutes before
1. Disconnected all power supplies to the system and wait 5 minutes.
2. Remove the Power Module (PM).
3. Remove the blank plate from the side of the terminal housing.
4. Remove the Control Module (CM).
5. Fit the 24 V PSU to the side of the terminal housing, ensuring that no cables or wiring are
trapped between the 24 V PSU and the terminal housing. Tightening torque: 1.5 Nm.
6. Connect the input cable to the DC link terminals in the terminal housing (black to DC- and red
to DC+).
7. The 4-way 24 V cable is routed underneath and then over the top of the CM.
8. Fit the 4-way connector as shown in the illustration below.
9. Fit the CM back into place - ensuring that it securely fastened into place.
10.Replace the PM.
11.Fit blanking cap to the 7/8th connector (note: there is no 7/8th connector on the USS variant
and the AS-i variant has no 7/8th connector or terminals).
12.Power can now be restored to the system.
Distributed converter for SIMOGEAR geared motors
Operating Instructions, 10/2020, FW V4.7 SP13, A5E31298649B AL
DANGER
system.
accessing any electrical connections of the system.
Installation
4.2 System Installation
57