Activate And Administer The System - Avaya CMC1 Installation, Upgrades And Additions

Table of Contents

Advertisement

Installing and Cabling the Cabinets

Activate and Administer the System

NOTE:
The Avaya Avaya CMC1 Media Gateway is a PPN cabinet only. Cabinet A is the
control carrier and Cabinets B and C are port carriers.
Power Up System
Single Cabinet Installations
1. Insert the translation card into the slot in the TN2402 Processor circuit
pack.
2. Fully seat the 650A Power Unit in the cabinet.
3. Set the circuit breaker at the AC load center to ON. This starts the system
reboot process. In about 2 minutes, verify the screen displays: Login:
Multi-Cabinet Installations
1. Insert the translation card into the slot in the TN2402 Processor circuit
pack.
2. Set the circuit breakers at the AC load center to ON.
3. Insert the power supplies into the port cabinets.
4. Insert the power supply into the control carrier. This starts the system
reboot process. In about 2 minutes, verify the terminal screen displays:
Login:
Deliver or Install the License File
If you have a direct switch connection:
1. Go to the RFA website, and, following the instructions in the "Deliver to
G3r/G3si/G3csi" chapter of the RFA Job Aid, deliver the License File.
If you do not have a direct connection:
1. Go to the RFA website, and, following the instructions in the "Deliver to
G3r/G3si/G3csi" chapter of the RFA Job Aid, deliver the License File to
your laptop/PC.
2. Open the License Installation Tool (LIT) application at your laptop/PC.
1-56
Issue 5 October 2002
NOTE:
Power up the port carriers first and the control carrier last.
555-233-118

Advertisement

Table of Contents
loading

Table of Contents