Alcatel-Lucent 7750 SR Manual page 1436

Os services guide
Hide thumbs Also See for 7750 SR:
Table of Contents

Advertisement

Functional Components
CCAG, each CCA represents 1/3 of rate and CIR defined for each scheduler in the policy. If two
of the active CCAs are on one IOM and one active CCA is on a second IOM, the first IOM would
receive 2/3 of the rate and CIR for each scheduler and the second IOM would receive 1/3. The
overall distribution is based on the following equation:
When a CCAG SAP is a member of a multi-service site, all SAPs in the multi-service site must be
CCAG SAPs created on the same CCAG-ID.
Page 1436
IOM Scheduler Rate = Policy Scheduler Rate * (Number Active CCAs on IOM / Total
Active CCAs)
IOM Scheduler CIR = Policy Scheduler CIR * (Number Active CCAs on IOM / Total
Active CCAs)
7750 SR OS Services Guide

Advertisement

Table of Contents
loading

Table of Contents