Parts List - IBM SAN512B-6 Installation, Service And User Manual

Ibm storage networking
Table of Contents

Advertisement

v Slotted (flat blade) screwdriver
v Hydraulic or assisted lift with a minimum raise of 140 cm (55 in.) and a
minimum capacity of 158.76 kg (350 lbs)
DANGER
If a lift tool with a capacity of at least 350 lbs is not available, the director
chassis must be depopulated completely before installing it into the rack.
Note any possible interconnecting cables so that you will be able to
reconnect them correctly. Remove the power supplies, fan modules, all of
the blades, the cable management comb, and the chassis door (if equipped).
Install the empty chassis into the rack following the chassis installation
instructions. The weight of the empty chassis is 78.5 lbs (35.6 kg) and must
be lifted by minimum 3 people. After securing the chassis to the rack,
reinstall the power supplies, fan modules, the blades and any possible
interconnecting cables and proceed with the installation.

Parts list

The following table lists the parts supplied in the 14U Chassis Rack Mount Kit. for
Four-Post Racks.
Note:
Depending on the device and installation, not all parts may be used on the device
type.
Chapter 3. Mounting the Device
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents