IBM SAN512B-6 Installation, Service And User Manual page 42

Ibm storage networking
Table of Contents

Advertisement

18
SAN512B-6 Installation, Service, and User Guide
DANGER
Mount the devices you install in a rack as low as possible. Place
the heaviest device at the bottom and progressively place lighter
18-32 kg (39.7-70.5 lbs)
devices above.
DANGER
Use safe lifting practices when moving the product.
18-32 kg (39.7-70.5 lbs)
CAUTION:
To prevent damage to the chassis and components, never attempt to
lift the chassis using the fan or power supply handles. These handles
were not designed to support the weight of the chassis.
18-32 kg (39.7-70.5 lbs)
CAUTION:
Do not attempt to lift the chassis by the protective cover attached over
the air vents on the port side.
18-32 kg (39.7-70.5 lbs)
CAUTION:
You can connect the device to building ground by connecting an
appropriate 2 AWG wire from a grounded connection to the 2AWG
Panduit LCD2-14AF lug on the nonport-side of the device.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents