Items Shipped - IBM SAN512B-6 Installation, Service And User Manual

Ibm storage networking
Table of Contents

Advertisement

Table 5. Installation and basic system configuration (continued)
Task
Verify that the device operates
correctly
Back up the configuration
Optional: Power off the devices

Items shipped

When unpacking the device, follow procedures under "Unpacking and transporting
the device". Verify that you have the following items. Save shipping cartons and
packaging in the event you need to return the device.
Packaged in device shipping carton:
v SAN512B-6 switch with shipping tray
v Packing foam
v Antistatic plastic
v Inner foam
Packaged in device shipping carton or separate carton.
v Door (for EMI compliancy)
v Power cords as ordered for installed power supplies
v Serial cable
v ESD wrist strap
v SFP extraction tool
v Power cord retainer clips
v Cable management comb assembly
v China-RoHS Hazardous/Toxic Substance statement
v Network Advisor web pointer card
v IBM documentation web pointer card
v Rack mount kit for your device
v Ground lug kit
Task details or additional information
v Check the LEDs to verify operation of functional parts. Refer to
the Monitoring the Device section of this guide.
v The following commands can be useful to establish an
operational baseline for the device. Refer to the Fabric OS
Command Reference for more information on these commands.
– psshow
– fanshow
– tempshow
– historyshow
– errdump
Use the interactive configupload command to back up the
configuration. Refer to "Backing up the configuration" on page 55
for more information.
Enter the shutdown command and wait for the device to power
down, and then unplug the power cords. Refer to "Powering down
the chassis" on page 56 for more information.
Chapter 2. Preparing for the Installation
Completed
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents