Chapter 4. Initial Setup And Verification; Configuration And Verification Task Guide; Configuration; Configuration And Verification Tasks - IBM SAN512B-6 Installation, Service And User Manual

Ibm storage networking
Table of Contents

Advertisement

Chapter 4. Initial Setup and Verification

This chapter provides the following information:
v "Configuration and verification task guide"
v "Items required" on page 38

Configuration and verification task guide

Before connecting the device to the fabric, use the following tasks to initially
configure and setup the device, verify correct operation, and back up the

configuration.

The configuration information is mirrored to the standby CP blade, which allows
the current configuration to remain available even if the active CP blade fails. The
configuration information for the device is stored in the WWN cards and the flash
memory of the CP blades. The configuration can be backed up to a workstation
(uploaded) and then downloaded to the active CP blade if necessary.
Note: The device WWN is set by the factory to match the license ID (which is
based on the chassis serial number).
© Copyright IBM Corp. 2017
Table 6. Configuration and verification tasks
Task
Establish a serial connection to the device
(chassis).
Configure IP addresses for the device.
Task details or additional information
Connect a serial cable to the console port on
active CP blade and use a terminal emulator
program (such as HyperTerminal on a PC,
or TERM, TIP, or Kermit in a UNIX
environment) to log in to the console port
and device. The blue "Active" LED
illuminates on the active CP blade.
Configure an IP address and subnet mask
for a chassis management connection.
Configure IP addresses, host names, subnet
masks, and gateway addresses for both
control processor (CP) blades.
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents