Figure 42. Removal and replacement of the control processor blade (CPX6)
8. If the blade is not being replaced by another blade, install a filler panel and
Installing a blade
About this task
Use the following steps to install both CP blades when the device power is off
(cold-swap procedure).
142
SAN512B-6 Installation, Service, and User Guide
reinstall the chassis door. The filler panel is required for proper chassis cooling.
The door is required to meet EMI compliance.