11. Install the output shaft assembly.
12. NOTE: Position the looped end of the reverse positioning spring around the shift lever reverse
pin.
Apply pipe sealant to the shift lever reverse pin threads and install the pin.
13. Install the roller bearings, the input shaft bearing spacer, the thrust bearing, and the thrust
washer.
Coat the 15 bearings, the spacer, the thrust bearing, and the thrust washer with grease.