Testing Basic Link Operation; Mount The Unit; Using The Pole-Mounting Bracket - 3Com 3CRWEASYA73 / WL-575 User Manual

Outdoor 11a building to building bridge and 11bg access point
Hide thumbs Also See for 3CRWEASYA73 / WL-575:
Table of Contents

Advertisement

T
B
ESTING
ASIC
Set up the units over a very short range (15 to 25 feet), either outdoors or
indoors. Connect the units as indicated in this chapter and be sure to perform all
the basic configuration tasks outlined in Chapter 4, "Initial Configuration." When
you are satisfied that the links are operating correctly, proceed to mount the units
in their intended locations.
M
OUNT THE
The bridge can be mounted on the following types of surfaces:
CAUTION: The bridge is intended for outdoor use only. Do not install the bridge
!
indoors.
U
Perform the following steps to mount the unit to a 2 to 3 inch diameter steel pole
or tube using the mounting bracket:
1
L
O
INK
PERATION
U
NIT
Pole
Wall
P
-M
SING THE
OLE
Place the V-shaped part of the bracket around the pole and tighten the
securing nuts just enough to hold the bracket to the pole. (The bracket may
need to be rotated around the pole during the antenna alignment process.)
Attach V-shaped
parts to pole with
provided nuts and
bolts
B
OUNTING
RACKET
3-2

Advertisement

Table of Contents
loading

Table of Contents