Toshiba e-studio200l Service Manual page 504

Multifunctional digital systems
Hide thumbs Also See for e-studio200l:
Table of Contents

Advertisement

[CDC0] Punch power failure occurred abnormality
MJ-1025
Is the problem solved by turning the power of the equipment OFF and ON?
YES Æ End
È
NO
Is the wiring between the finisher controller PC board and punch controller PC board cor-
rect?
NO Æ
È
YES
Does the voltage between the CN14-5 (+) and CN14-3 (-) on the finisher controller PC
board become 24 V?
YES Æ Replace the punch controller PC board.
È
NO
Replace the finisher controller PC board.
[CDD0] Folding sensor abnormality
MJ-1025
Is the folding position sensor (PI10) working properly?
NO Æ
È
YES
Is the wiring between the finisher controller PC board and folding position sensor (PI10) cor-
rect?
NO Æ
È
YES
Is there any mechanical problem with the fold jam releasing dial?
YES Æ Fix the mechanism.
È
NO
1) Replace the staple/fold motor (M7).
2) Replace the finisher controller PC board.
e-STUDIO200L/202L/230/232/280/282 TROUBLESHOOTING
Correct the wiring.
Replace the sensor.
Correct the wiring.
5 - 74
June 2004 © TOSHIBA TEC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents