Installing Additional Modules - Abus Secvest 2WAY Installation Instructions Manual

Hide thumbs Also See for Secvest 2WAY:
Table of Contents

Advertisement

25. Installing additional modules

Before connecting the ISDN / GSM / ethernet / GPRS module to the alarm centre,
disconnect the electric power supply. Firstly, access the installer menu on the alarm
centre. This prevents a tamper alarm from being triggered when the top part is
removed from the base plate. Loosen the housing screws on the lower side of the
wireless alarm centre as shown in the diagram.
Open the top part and disconnect the connecting cable between the base plate and the
top part.
the top part around and remove the four housing screws (1) on the bottom. Ensure that
you also disconnect the loudspeaker cable and the battery supply cable (2).
Carefully remove the cover of the top part. Be careful when handling the siren
connection and the tamper spring. The PCB of the wireless alarm centre can now be
seen.
1
Base of ISDN/GSM module
3
Siren connector
5
Microphone
7
Code reset jumper
9
Loudspeaker connection
Turn
94
2
USB port
4
Tamper switch
6
Kickstart jumper
8
Battery connection
10
Chip key reader

Advertisement

Table of Contents
loading

Table of Contents