Installing The System; 50 Hz Mains Connection - Abus Secvest 2WAY Installation Instructions Manual

Hide thumbs Also See for Secvest 2WAY:
Table of Contents

Advertisement

2. Installing the system

The following pages describe basic system programming.
A step-by-step guide of the most important aspects on the Secvest 2WAY system is
presented.
Attach the Secvest 2WAY alarm centre.
The alarm centre may only be installed by qualified specialists.
The device is designed for indoor use only.
The PSU is connected to the 230 V ∼ 50 Hz domestic mains
network over a separate, electrically protected line.
Connecting the system to the 230 V AC ∼ 50 Hz mains network is
subject to national regulations. Check that no voltage is present in
the connection cable when fitting. Connect the 230 V power
supply to the mains connector according to EN60950-1 as shown
in the diagram. Remember to fix the cable in the cable clamp to
relieve tension on the cable.
Always replace the mains fuse with one of the same type. Never
use fuses with higher voltage ratings than those specified.
The green/yellow (earth) wire should be slightly longer than the
live and neutral wires.
2.1 230 V ∼ 50 Hz mains connection
230 Volt ∼ 50 Hz
Colour configuration of the lines:
L
Brown or black
Green/yellow
N
Blue
13
Detach the cable relief points
and secure the power cable.

Advertisement

Table of Contents
loading

Table of Contents