Checklist 2: Install a New G700 without an S8300 (continued)
Major Task
Configure the G700
page 201
Prepare to install firmware on
the G700
on page 211
Install New Firmware on the
G700 Media Gateway
page 214
Administer Communication
Manager
on page 219
Complete the Installation
Process
on page 235
Subtasks
on
- Assign IP addresses to the G700 processors
- Set up IP routing for the stack
- Set up default IP route for the G700
- Check IP connections
- Set up controller list for the G700
- Configure X330 Expansion Module, if
necessary
- Verify contents of the tftp directory
- Determine which firmware to install
- Install firmware on the P330 stack processor
on
-Set Rapid Spanning Tree
- Install firmware on the G700 media gateway
processor
- Install firmware on the media modules
- Install firmware on other G700s in the stack or
network, if any
- Reboot the system
- Assign node names, if necessary
- Administer network regions
- Assign LSPs to network regions
- Administer IP interfaces
- Administer the LSP form
- Add media gateway
- Verify changes
- Enable announcements, if necessary
- Save translations
- Check planning documentation
- Connect and administer test endpoints
- Complete electrical installation
- Enable adjunct systems
About the Installation Roadmap and Task Lists