6. Pull the cables off the PCB:
7. Pull the cable (12) out of the terminals.
8. Pull the cable (12) and encoder cable (8) off the control.
9. Loosen the screws (1).
10. Remove the holder (11) with the PCB.
Important
11. Make sure not to lose the nut (6).
Fig. 80: Disassembling the sewing motor (2)
(13) - Tensioning roller
12. Loosen the screw (14) on the tensioning roller (13)
The toothed belt tension is slack.
13. Remove the tensioning roller (13).
96
• CAN cable (2)
• Cable oil level indicator lighting (3)
• Cable thread trimmer (4)
• Cable thread trimmer (5) (optional)
• CAN cable (7)
• Reference cable (9)
• ENG-ON cable (operation lock) (10)
⑬
⑭
(14) - Screw
Service Instructions D869 e-con - 00.0 - 09/2023
Sewing motor