Fig. 90: Changing the upper toothed belt (4)
(11) - Screws
(12) - CAN cable
(13) - Cable oil level indicator lighting
(14) - Cable thread trimmer
(15) - Cable thread trimmer (optional, only
(16) - Nut
10. Place the holder (21) with the PCB.
11. Tighten the screws (11).
102
⑪
⑫
⑬
⑪
⑭
⑮
⑯
on 2-needle machines)
(17) - CAN cable
(18) - Encoder cable
(19) - Reference cable
(20) - ENG-ON cable (operation lock)
(21) - Holder
(22) - Cable
Service Instructions D869 e-con - 00.0 - 09/2023
Sewing motor
⑪
22
21
⑳
⑲
⑱
⑰
⑪