Sewing motor
12. Slip the cables onto the PCB:
13. Clamp the cable (22) into the terminals.
14. Insert the cable (22) into slot M of the control ( p. 235).
15. Insert the encoder cable (18) into slot E of the control ( p. 235).
16. Assemble the toothed belt cover with large handwheel ( p. 23),
Service Instructions D869 e-con - 00.0 - 09/2023
• CAN cable (12), slot X7
• Cable oil level indicator lighting (13), slot X8
• Cable thread trimmer (14), slot X11
• Cable thread trimmer (15) (optional), slot X12
• CAN cable (17), slot X1
• Reference cable (19), slot X4
• ENG-ON cable (operation lock) (20), slot X5
making sure that the centering pin is seated firmly, as the hall sensor
will otherwise not be able to complete referencing properly.
103