Dürkopp Adler D869 e-con Service Instructions Manual page 92

Hide thumbs Also See for D869 e-con:
Table of Contents

Advertisement

Fig. 74: Changing the upper toothed belt (1)
(1) - Screws
(2) - CAN cable
(3) - Cable oil level indicator lighting
(4) - Cable thread trimmer
(5) - Cable thread trimmer (optional, only
6. Pull the cables off the PCB:
7. Pull the cable (11) out of the terminals.
90
on 2-needle machines)
• CAN cable (2)
• Cable oil level indicator lighting (3)
• Cable thread trimmer (4)
• Cable thread trimmer (5) (optional)
• CAN cable (7)
• Reference cable (8)
• ENG-ON cable (operation lock) (9)
(6) - Nut
(7) - CAN cable
(8) - Reference cable
(9) - ENG-ON cable (operation lock)
(10) - Holder
(11) - Cable
Service Instructions D869 e-con - 00.0 - 09/2023
Toothed belt

Advertisement

Table of Contents
loading

Table of Contents