Download Print this page

ferrotec EVM-4 Mounting Instruction page 60

Electron beam evaporator

Advertisement

Mounting Instructions EVM-4, EVM-6, EVM-8, EVM-10
8.5.5 Calibration
Inspection of the machine
8.6
After completing cleaning, maintenance and repair work:
1. Check that the protective conductor connections are firm.
2. Check that the work has been carried out properly and fully.
If all the functions work properly, the electron beam evaporator is handed over to the
operating personnel.
Version 1.3.19
Adjust the calibration pin at the drive unit so that it can catch
in the groove in the decoding cylinder as shown in fig. 8-13.
For this the calibration pin must be turned 90° out of its
standard setting. The pin must catch in the groove in the
decoding cylinder by spring force during a crucible rotation
so that it can lock it.
Activate crucible control by moving the right joystick in the
menu "Options-Service-Pocket" as shown in the illustration
below.
Stop rotation of the crucible with the controller when crucible
no. 1 is positioned correctly.
Turn the calibration pin from locked position back to its
standard position. The decoding cylinder with the top part of
the crucible also turns when this is done
All other crucible positions are detected automatically by the
optical recognition system in the drive unit on the basis of
the setting "Options-System Setup-Pockets" by data transfer
of the corresponding bit pattern.
You can then select all crucibles directly with the menu "Set
Pockets".
After checking and replacing spare and wearing parts make
sure that all safety systems are in working order.
page 60/64
NOTICE
Ferrotec GmbH

Advertisement

loading

Related Products for ferrotec EVM-4

This manual is also suitable for:

Evm-6Evm-8Evm-10