Download Print this page

ferrotec EVM-4 Mounting Instruction page 23

Electron beam evaporator

Advertisement

Mounting Instructions EVM-4, EVM-6, EVM-8, EVM-10
 Installation
Delivery package
5.1
1
2
3
Fig. 4 Delivery package
The delivery package consists of:
1. Base unit (evaporator and bottom feedthrough)
2. Pipe spanner
3. Water hose
4. Water distributor
5. Drive cable
6. Drive unit
7. Instruction handbook and tool kit (see fig. 5-2)
Version 1.3.19
A detailed specification of the delivery package is to be found
in the acknowledgement of the order.
page 23/64
Mounting
7
Instruction
4
5
6
NOTICE
Ferrotec GmbH

Advertisement

loading

Related Products for ferrotec EVM-4

This manual is also suitable for:

Evm-6Evm-8Evm-10