2.15 System Verification
EAR99 Technology Technology Subject to Restrictions Contained on the Cover Page
It is recommended that the system operation be verified using
the CombiFlash Universal verification kit, Teledyne ISCO P/N
60-523-4317:
• The instructions for Universal Verification Mix can be
found in Instruction Sheet P/N 69-5233-870.
• For PurIon equipped systems the following test
mixtures are also needed:
· P/N 60-5234-315 Test Mixture for APCI probes, 5 mL.
· P/N 60-5234-627 Test Mixture for ESI probes, 10 mL.
CombiFlash NextGen Systems
Section 2 Preparation
2-25