Section 2 Preparation
2.16 Installation
Qualification
Checklist
Step
Section
1
2.1
2
2.2
3
2.3
4
2.4
5
2.4
6
2.5
7
2.6
8
2.7
9
2.8
10
2.9
11
2.10
12
2.1 – 2.15
13
2.11
14
2.12
15
2.14
16
2.15
Certification of Section 2 Completion
Comments:
2-26
Table 2-1 may be completed to verify and document the instal-
lation procedures contained in Section 2 of this guide:
Table 2-2 Installation Qualification Checklist
Description
Unpacking the unit
Instrument location
Connect power
Connect solvent lines (if not pre-installed)
Connect waste lines (if not pre-installed)
External ELSD gas (optional)
Connect and route drain lines
Vapor Enclosure (optional)
Install Solid Load Cartridge Cap Ring Support
and SLCC Storage Bracket (optional)
Position the system
Installation of the collection tube racks
Install PurIon (optional)
Turn on the power
Configure the system
Prime the solvent lines
System verification
Installer Name (print):
Installer Signature:
Operator Name (print):
Operator Signature:
EAR99 Technology Technology Subject to Restrictions Contained on the Cover Page
Installer
Initials
Date:
Date:
Operator
Initials

Advertisement

Table of Contents
loading

This manual is also suitable for:

Combiflash nextgen 100Combiflash nextgen 300

Table of Contents